Full Automatic Cardboard Carton Box Aluminum Foil Plastic Flatbed Coating Gluing Thermal Film Laminating Machine
Description
Basic Info
Model NO. | DCL-M1300 / M1700 |
After-sales Service | Yes |
Warranty | 1 Year |
Classification | Post-Coating Laminating Machine |
Application | Packaging Paper, Film Material, Color Printing |
Driven Type | Electric |
Automatic Grade | Automatic |
Membrane Material | PVC Film |
Plastic Film Mulching Modes | Cold Laminating |
Performance | Waterproof |
L/D Ratio for Screw | 32:1 |
Max Extrusion | 260kg/H |
Coating Width | 600-1250mm |
Adopt Material | Non Woven/ BOPP/Aluminum Foil |
Transport Package | Wooden Case |
Specification | L 9800* W 8000* H 3200mm / L9600*W10000*H3250mm |
Trademark | TINUO |
Origin | Zhejiang |
HS Code | 8451800002 |
Production Capacity | 500PCS/Year |
Product Description
High Speed Extrusion Hot Melt Lamination MachineProduct Description1.Machine Procedure Raw material feeding -> Automatic tension -> Corona equipment -> Composite extruding -> Compounding processing -> Cooling -> Rewinding2.Product Sample
4.Machine Technical Data
SN | Item | Specification |
1 | Extrusion die width | 1400mm / 1600MM |
2 | Coating width | 600-1250mm / 900-1600MM |
3 | Max coating speed | 80-150m/min / 100~150m/mi |
4 | Adopt material | Non woven/ BOPP/Aluminum foil |
5 | Coating thickness | 0.01-0.05mm / 0.008-0.05mm |
6 | Inaccuracy thickness of coating film | ±6% / ±5% |
7 | Setting range of Auto-tension | 10-200kg/ 10-150kg /entire width (constant tension) |
8 | L/D ratio for screw | 32:1 |
9 | Rewinding roll diameter | Ø1300mm |
10 | Compound cooling roller | Ø500×1300mm / Ø500×1700mm |
11 | Max extrusion | 260kg/h / 200kg/h |
12 | Total power | 130KW |
13 | Working power | 70-80kw / 80-95kw |
14 | Overall size | L 9800* W 8000* H 3200mm / L9600*W10000*H3250mm |
15 | Weight of Machine | 15000KGS (40HQ*1, 20HQ*1) |
Tinuo is a comprehensive mechanical manufacturing enterprise with research, development, production and sales, which specializes in making one full line Biodegradable Bag Making machinery. In order to create more economic and offer the one-step service, we collect all the knowledge and resource to service our customers with complete solution in Eco package industry in our field, including the paper bag machine, printing machine, non-woven production line, non-woven bag making machine.Closely with international advanced technology production technology, Tinuo has more than 80 patents, due to the changing of market demands, Willing and able to customize the machines. We are ISO9001:2000 certified cooperation, And our products has CE, B.V, SGS and GMC .... With rich technology and capital resources, we pay high attention to the new product innovation.
Our business covers world markets, especially good at South America, Middle East and North America. Till now Tinuo has signed an agency cooperation with including Chile, Egypt, South Africa, turkey, Lebanon ,and many other countries, more timely and roundly to provide customers with overseas technical help. Annual output value over $15 million, which makes it keep the leading position in this field in China land.
Q1. How to install and operate the machine?
Due to the Global Epidemics we can not send the engineer , will provide the manual and installation video.
After the global epidemic end, The seller will send 1 engineer to install, test the production line and train customers' workers in buyers' factory. It will take 1 week for whole installation and training.
Q2. What should we charge for your engineer?
The buyer should cover engineers' salary, visa cost, round-trip air tickets, accommodations, transportation in buyers' country, food, medical care, safety cost, and related cost happens in buyers' country. Also, the buyer should prepare enough labor, electric wire outside the control panel and tools for installations.Engineer's salary is USD 80/day, depending on how the engineer make you satisfied. The date he arrives and leaves shall be counted as paid day.
Q3. How long is your machine's warranty period?
Warranty period for the delivered equipment will be 12 months after completion of erection but not later than 18months after shipment. In case any item proves to be defective and the damage is confirmed by seller's technicians within this period, the seller will at their choice either send engineer to repair or supply a new one for replacement free of charge on the basis of CNF delivery.
The above item does not include the parts, which have regular spares or the parts damaged from normal wear, abnormal operation, improper maintenance and inadequate civil works. The seller is not liable for any production loss under any circumstances.
Q4. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finish installing. In case you have any problem. You can contact our after sales specialist at any time. Engineers will help to take a solution video according your description.
Q5. How do you arrange packing for machine?
As per export standard, they will also be treated before delivery against damage and rusting.
Our Contact