Aluminum Foil Plastic Flatbed Coating Gluing Thermal Film Laminating Machine High Productivity Nonwoven Fabric Laminating Coating Machine
Laminating Machine Main Features 1.This Non woven fabric laminating machinemaking use of the good adhesive property of p
Description
Basic Info
Membrane Material | Paper\BOPP\PE\Aluminum Foil |
Plastic Film Mulching Modes | Hot Laminating |
Performance | Waterproof |
Max.Coating Speed | 10-150m/Min |
Voltage | 220V/380V |
Transport Package | Standard Packaging, Wooden Boxes, Containers or AC |
Specification | customized |
Trademark | Jinxin |
Origin | China |
HS Code | 8420100090 |
Production Capacity | 100sets/Year |
Product Description
Laminating MachineMain Features
1.This Non woven fabric laminating machinemaking use of the good adhesive property of polypropylene & polyethylene at melting status machine adheres and aminates Non woven\Paper\BOPP\PE\Aluminum foil to Nonwoven fabric,the extruder with helical gear reducer steel adopts automatic temperature-control system to adjust melting temperature, the screw and cylinder are made of alloy steel and done treatment of nitrogenation.2.The double-die can do single or double-face coating, width of coating & laminating can be regulated, and control coating thickness,laminating speed, automatic edge cutting, edge-blowing, cutting-off and winding devices are applied.3.This machine has the functions of fully automatic material receiving and refuelling,PLC control system,fully automatic weight control system,man-machine operation interface, and it is a high-quality supply in the same industry.
Technical Parameters
Model | JXL-M1000 |
Extrusion die width | 1200mm |
Coating width | 500-1000mm |
Max.Coating speed | 10-150m/min |
Coating thickness | 0.01-0.1mm |
L/d ratio for screw | 32:1 |
Rewinding roll diameter | 1200mm |
Overall size | 12500*7000*5000mm |
Total power | 70kw |
Mirror cool roll diameter | 510mm |
Adopt material | Non woven\Paper\BOPP\PE\Aluminum foil |
FAQ1.
Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.All is prepared)2.
Q:How many days will you finish installing?
A:We will finish installation and training within 15 days.3.
Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 100USD one day per person.4.
Q:How long is your machine's warranty period?
A: All our machine have one year guarantee, starting from finished installation.5.
Q:How could you do if the parts broken within warranty?
A: We would express the free replacement parts during the warranty date.6.
Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.7.
Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Our Contact
Send now