2 Roll Lab Rubber Mixing Mills Calender Machine with Cooling System
2 Roll Laboratory Mixing Mill,6" Lab Mixing Mill I. Feature1. Roller adopt alloy chilled cast iron. Its surface is with
Description
Basic Info
Model NO. | XK-160 |
Color | as Your Requirement |
Delivery Time | Within 30 Working Days After Receiving The Deposit |
Transport Package | Standard Export Packing |
Specification | weight: about 6.5t |
Trademark | BOJIA |
Origin | Qingdao, China |
HS Code | 8477800000 |
Production Capacity | 50 Sets Per Month |
Product Description
2 Roll Laboratory Mixing Mill,6" Lab Mixing MillI. Feature1. Roller adopt alloy chilled cast iron. Its surface is with high hardness and wearproof. Roller surface do mirror processing. Two rollers inner hollow spray type. Roller surface temperature uniformity.2. Roller is ball bearing, grease lubrication structure.3. Roller adopt device respectively adopt worm wheel, worm drive. It could optional install motorized nip adjustment,easy to operate.4. This machine is whole base structure, convenient to install.II. Technical parameter
Item | XK-160 | XK-250 | XK-360 | XK-400 | XK-450 | XK-550 | XK-560 | XK-660 | XK-710 |
Roll diameter (mm) | 160 | 250 | 360 | 400 | 450 | 550 | 560-510 | 660 | 710 |
Roll working length | 320 | 620 | 900 | 1000 | 1200 | 1500 | 1530 | 2130 | 2200 |
Front roll linear speed (r/min) | 9 | 16.3 | 16.7 | 19.3 | 21.8 | 22.5 | 27.2 | 28 | 31.9 |
Speed ratio of rolls | 01: 01.4 | 01: 01.1 | 01: 01.3 | 01: 01.3 | 01: 01.3 | 01: 01.2 | 01: 01.2 | 01: 01.2 | 01: 01.5 |
Max roll space (mm) | 4.5 | 8 | 10 | 10 | 12 | 16 | 15 | 0.5-15 | 0.5-15 |
Compound feeding capacity(kg) | 1-2 | 10-15 | 20-25 | 18-35 | 50 | 50-65 | 50-65 | 165 | 190 |
Motor power(kw) | 5.5 | 18.5 | 30 | 45 | 55 | 110 | 90 | 240 | 280 |
Dimensions(L× W× H) | |||||||||
L (mm) | 1133 | 2722 | 4200 | 4920 | 5405 | 6646 | 6270 | 7280 | 8185 |
W (mm) | 920 | 1115 | 1780 | 1780 | 1740 | 2736 | 2282 | 3400 | 3910 |
H (mm) | 1394 | 1345 | 1760 | 1800 | 1790 | 2105 | 2000 | 2530 | 2270 |
Gross weight (T) | ~2 | ~3.2 | ~6.5 | ~8 | ~11.4 | ~22 | ~22.5 | ~49 | ~51 |
III. Picture For Reference
IV. Test Before Delivery
Before leaving factory, this rubber vulcanizing machine needs to pass 24 hours' test running and guarantee no oil leakage and seeping to avoid unnecessary quality problems.
V. Packaging
Equipment painting completed before delivery, and then wrapped with stretch film, to protect the painting surface, we use wooden packaging outside.The key parts of the machine, such as electronic control box, will be wrapped by shockproof packaging materials, and then packed in wooden cases.
VI. Our service
1. Test running: The above machines are all passed inspection of 3~5 hours of full load operation before leaving our factory. And we will take the video and send it to you for inspection. You can use it directly thus saving the time of test-run and expense. And we also warmly welcome to our factory to inspect and test running.
2.Warranty: 12 months after installation, if our machines have any problems, please feel free to contact me. We will solve it for you as soon as possible, and give you the best services.
If you interested in our products mentioned above. Kindly let us know by return email. Then I will supply you with further information. Meanwhile, welcome to visit our factory!
FAQ:
1.
Q: Where is your factory? How can I visit ?
A: Our factory located in Qingdao city.You can fly to QINGDAO LIUTING airport,then we can pick you up to our factory for your visiting.We are looking forward to your visiting.
2.
Q: How does your factory control the quality of machines and after sales service?
A: Our machines have passed CE, ISO, SGS certification, with best quality and reasonable price. All our machines have 1 year guarantee, will be provided for a lifetime maintenance.
3. What's your payment term?
A: Common is 30% deposit by T/T, the balance paid against shipping documents
Or L/C at sight.
4.
Q: Can you design new product for us?
A: We have a professional development team that can make new products according to your requirements.
5. Delivery time of the rubber machines?
This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.
6. What does your factory do regarding quality control?
We pay much more attention to the quality controlling from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.
7. What's the machine quality guarantee?
we provide one year warrenty for our machines.We choose the world's famous brand of components to keep our machine in perfect working condition.
8. Are you able to provide the installation and commissioning of machines overseas? How long will it take?
Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.
9. How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.
Prev: Chinese Supplier Lab PE Blown Film Extrusion PE Film Machine
Next: Mini Home Use 3D Printing Plastic Filament Extruder 3 D Filament Extrusion Line
Our Contact
Send now